Sachin Wani's residence

PPR-2026-09-00182 · 01 Sep 2026, 11:53 PM
Done
EngineerPratik
Site typeVRV · General
People on site
Activity6 panels replacement done.
Tomorrow's planPlanned for tomorrow: Commissining.
Next step date30 Sep 2026

Current project steps

20 tracked
HS Material Delivery ODU
Done
14 Aug 2026, 11:21 PM · Pratik
Grill Installation
Not required
14 Aug 2026, 11:21 PM · Pratik
ODU Dismental
Not required
01 Sep 2026, 11:53 PM · Pratik
Collar
Not required
14 Aug 2026, 11:21 PM · Pratik
Main Ducting Dismental
Not required
01 Sep 2026, 11:53 PM · Pratik
Main Ducting
Not required
14 Aug 2026, 11:21 PM · Pratik
Copper Piping Dismental
Not required
01 Sep 2026, 11:53 PM · Pratik
Disk Valve
Not required
14 Aug 2026, 11:21 PM · Pratik
Fan Installation
Not required
14 Aug 2026, 11:21 PM · Pratik
IDU Dismental
Not required
01 Sep 2026, 11:53 PM · Pratik
Fresh Air - PVC PIPE / Duct
Not required
14 Aug 2026, 11:21 PM · Pratik
Drain Dismental
Not required
01 Sep 2026, 11:53 PM · Pratik
odu unit installation
Done
01 Sep 2026, 11:53 PM · Pratik
1st RA Measurement Submitted by PE
Done
14 Aug 2026, 11:21 PM · Pratik
IDU/ODU Pressure Testing
Done
14 Aug 2026, 11:21 PM · Pratik
LS Pressure Testing
Done
14 Aug 2026, 11:21 PM · Pratik
Support
Done
14 Aug 2026, 11:21 PM · Pratik
Civil Opening
Done
14 Aug 2026, 11:21 PM · Pratik
LS Material Delivery
Done
14 Aug 2026, 11:21 PM · Pratik
Underdake Insulation
Not required
14 Aug 2026, 11:21 PM · Pratik

Complete visit timeline

2 visits
01 Sep 2026, 11:53 PM
Pratik · PPR-2026-09-00182
Step updates
Drain Dismental · Not requiredMain Ducting Dismental · Not requiredCopper Piping Dismental · Not requiredIDU Dismental · Not requiredODU Dismental · Not requiredodu unit installation · Done
Activity6 panels replacement done.
Tomorrow's planPlanned for tomorrow: Commissining. · starts 30 Sep 2026
14 Aug 2026, 11:21 PM
Pratik · PPR-2026-08-00123
Step updates
HS Material Delivery ODU · DoneGrill Installation · Not requiredODU Dismental · Not requiredCollar · Not requiredMain Ducting Dismental · Not requiredMain Ducting · Not requiredCopper Piping Dismental · Not requiredDisk Valve · Not requiredFan Installation · Not requiredIDU Dismental · Not requiredFresh Air - PVC PIPE / Duct · Not requiredDrain Dismental · Not requiredodu unit installation · Done1st RA Measurement Submitted by PE · DoneIDU/ODU Pressure Testing · DoneLS Pressure Testing · DoneSupport · DoneCivil Opening · DoneLS Material Delivery · DoneUnderdake Insulation · Not required
ActivityPre-commissioning completed today.
Surface box not available. Supply not available for outdoor unit.
Tomorrow's planHoliday

Photos and files

2 attachments

Report processing

done
photo save
done
01 Sep 2026, 11:54 PM
1 photo(s) uploaded
sheet write
done
01 Sep 2026, 11:54 PM
1 row(s) written
pms update
done
01 Sep 2026, 11:54 PM
PMS row stamped
pdf
done
01 Sep 2026, 11:54 PM
PDF built
email
done
01 Sep 2026, 11:58 PM
emailed
whatsapp
done
01 Sep 2026, 11:58 PM
SENT — doc media=3809902712485742